Airlines, Airports & Routes Topics about airports, routes and airline business.

Luton-9

Old 11th Aug 2019, 21:01
  #2781 (permalink)  
 
Join Date: Apr 2012
Location: ESSEX
Posts: 274
Likes: 0
Received 0 Likes on 0 Posts
The escalation,of the language is amusing . How can Luton council declare a ‘climate emergency’ when, in reality it’s raining and there is some local flooding .. Its a bit like network rail declaring electricity catastrophe when there is a power outage in Epping
SARF is offline  
Old 11th Aug 2019, 23:48
  #2782 (permalink)  
Paxing All Over The World
 
Join Date: May 2001
Location: Hertfordshire, UK.
Age: 67
Posts: 10,126
Received 58 Likes on 48 Posts
They could because 'weather' and 'climate' are two different things. Although, of course, they won't.
As you were.
PAXboy is offline  
Old 15th Aug 2019, 12:05
  #2783 (permalink)  
dvc
 
Join Date: May 2018
Location: Luton
Posts: 59
Likes: 0
Received 0 Likes on 0 Posts
First one through Foxtrot
dvc is offline  
Old 17th Aug 2019, 06:55
  #2784 (permalink)  
 
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,749
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by LTNman
The second multi story which was having parking sold from August 19th has had that date dropped. There has been zero prospect of that car park being finished for a long time. At the time of writing not even the ramps have had concrete poured yet.
Airports own web site say it will open next week!
pabely is offline  
Old 17th Aug 2019, 10:17
  #2785 (permalink)  
 
Join Date: Jul 2007
Location: No fixed abode
Posts: 787
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by LTNman

MS1 is being clad. The first multi story to be completed is called MS2

According to the Airport website it’s the other more logical way around( first MSCP will be called MSCP1)

The opening of the second MSCP is important as this will now allow the closing off of the section of the mid term car park to enable the starting on the next section of the DART.
I am guessing only a couple of floors will be open next week as the ground floor drop off area will take longer to finish due to road realignments.
Falcon666 is offline  
Old 19th Aug 2019, 13:57
  #2786 (permalink)  
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,802
Likes: 0
Received 0 Likes on 0 Posts
Remarkable scenes were witnessed today as the passenger footbridge from the existing multi story was having its walls and ceilings washed. This is the first time this has happened as the bridge was handed over by the builders without being cleaned and was filthy and grime ridden on day one of its opening in 2016.

I had a close look at the second multi story which was meant to open today. Still think this opening is a few days away and when it does open only the 1st and maybe the 2nd floors will open. Both these floors have had the parking bays painted in with the top floors are still receiving concrete.

The main core containing lifts is still being clad, contains no windows and has a temporary roof made out of nailed down plastic. Looking through the windowless openings the lifts still seem to be boarded up.

The exit route from the down ramp onto the ring road has no road markings and no give way signs have yet appeared. The pillars on the ramp have only been part painted with some untouched so it will be challenging to paint these if the ramp is opened to traffic.

While the hoarding has been removed that will access the new multi story the temporary route to the lifts and staircase has yet to be boarded. This is giving a view of where those that are paying premium money for valet parking are having their cars parked which is in the middle of a building site on what will be the drop off area. With the air thick with dust I am wondering if the cars are washed before being handed back over.

Last edited by LTNman; 19th Aug 2019 at 15:55.
LTNman is online now  
Old 20th Aug 2019, 18:49
  #2787 (permalink)  
 
Join Date: Jul 2007
Location: No fixed abode
Posts: 787
Likes: 0
Received 0 Likes on 0 Posts
https://mediahub.london-luton.co.uk/...rvice?ref=Home

Didn’t get the four per hour they wanted but I guess it’s a start.

Also a NOTAM is out for taxiway Bravo realignment, starting this Thursday.
Falcon666 is offline  
Old 21st Aug 2019, 05:21
  #2788 (permalink)  
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,802
Likes: 0
Received 0 Likes on 0 Posts
Luton will end up with 2 express, 4 semi fast and 2 all stopper services per hour, total 8 trains per hour.

The issue for passengers departing St Pancras is do they use the high level platforms for the half hourly non stop service or the underground platforms for the 4 trains an hour semi fast service. In many cases the semi fast option will still be quicker as there will be less platform waiting.

As stated the airport and council were lobbying for 4 express trains per hour so got half of what they wanted which will be a disappointment for them. Also unless things change with a change of franchise, group saver tickets are not accepted on non stop services to and from St Pancras.

Last edited by LTNman; 21st Aug 2019 at 18:00.
LTNman is online now  
Old 21st Aug 2019, 21:40
  #2789 (permalink)  
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,802
Likes: 0
Received 0 Likes on 0 Posts
Seems Luton is keeping open its existing de-icing spots on the south stands giving a total of 7 locations where aircraft can be de-iced with their engines running. Luton has apparently the largest de-icing facility in the UK for engine running de-icing.
LTNman is online now  
Old 22nd Aug 2019, 05:19
  #2790 (permalink)  
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,802
Likes: 0
Received 0 Likes on 0 Posts
East Midland Railways are buying a second hand fleet of what will be nearly 20 year old Siemens Class 360 trains from Greater Anglia Railways to serve Luton Airport for its express train service to Parkway that will continue to Corby.

The trains will only have 4 carriages although they can be joined to make 8 car sets. We will have to see what happens but a 4 car set could well suffer from overcrowding if airport passengers start to use the service in numbers.
LTNman is online now  
Old 22nd Aug 2019, 07:57
  #2791 (permalink)  
 
Join Date: Aug 2014
Location: Outer London
Age: 43
Posts: 600
Likes: 0
Received 0 Likes on 0 Posts
Wizz are to move the LTN-Sibiu route to SEN from the end of October. They are also launching SEN-Bucharest and Vilnius.
AirportPlanner1 is offline  
Old 22nd Aug 2019, 08:02
  #2792 (permalink)  
 
Join Date: Jul 2006
Location: UK
Age: 75
Posts: 2,690
Received 0 Likes on 0 Posts
Originally Posted by LTNman
East Midland Railways are buying a second hand fleet of what will be nearly 20 year old Siemens Class 360 trains from Greater Anglia Railways to serve Luton Airport for its express train service to Parkway that will continue to Corby.
The trains will only have 4 carriages although they can be joined to make 8 car sets. We will have to see what happens but a 4 car set could well suffer from overcrowding if airport passengers start to use the service in numbers.

Having often travelled on those very trains I don't recall much dedicated baggage space.
Expressflight is online now  
Old 22nd Aug 2019, 08:12
  #2793 (permalink)  
 
Join Date: Dec 2009
Location: Belgium
Posts: 185
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by AirportPlanner1
Wizz are to move the LTN-Sibiu route to SEN from the end of October. They are also launching SEN-Bucharest and Vilnius.
Interesting move. I am wondering why Sibiu got picked.
1sky is offline  
Old 22nd Aug 2019, 10:29
  #2794 (permalink)  
 
Join Date: Apr 2004
Location: -
Posts: 747
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by 1sky
Interesting move. I am wondering why Sibiu got picked.
They have however also announced a daily service to Vienna and twice weekly service to Castellon in Spain from Luton.

Vienna is another they'll be competing directly with easyJet on!

https://www.businesstraveller.com/bu...ndon-southend/
gilesdavies is offline  
Old 22nd Aug 2019, 10:32
  #2795 (permalink)  
 
Join Date: Feb 2012
Location: Luton
Posts: 399
Likes: 0
Received 0 Likes on 0 Posts
Sibiu

Originally Posted by 1sky


Interesting move. I am wondering why Sibiu got picked.
Wizzair carry around 100,000 pax a year on that route at LTN. It makes no sense to drop the service.
Lee Baker Street is offline  
Old 22nd Aug 2019, 10:36
  #2796 (permalink)  
 
Join Date: Feb 2018
Location: Wales
Posts: 1,316
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Lee Baker Street


Wizzair carry around 100,000 pax a year on that route at LTN. It makes no sense to drop the service.
Unless they got a better offer from SEN to operate it there.
PDXCWL45 is offline  
Old 22nd Aug 2019, 11:07
  #2797 (permalink)  
 
Join Date: Jul 2016
Location: Between the check-in desks
Posts: 443
Received 0 Likes on 0 Posts
That will upset the council as they promote the building of a second terminal.

Wizzair carry around 100,000 pax a year on that route at LTN. It makes no sense to drop the service.
Remember Waterford when that ended up at Southend the passengers did not follow. Might be different now if there are no alternate routes.
Spanish eyes is offline  
Old 22nd Aug 2019, 11:29
  #2798 (permalink)  
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,802
Likes: 0
Received 0 Likes on 0 Posts
Construction update

Gateway bridge for the Dart is being prepared for the concrete tracks.


Taxiway Bravo diversion has opened which will allow the existing taxiway to be dug out for the Dart tunnel.


As reported before the multistory car park numbering has been reversed. The new car park which has now opened is Car Park 2.
Photo shows the foot entrance with the first floor ramp that connects to the ring road just forward of the netting which is protecting a missing section of the first floor.


The car park has opened with no working lifts. Due to the height of the ceiling of the drop off area passengers are having to lug suitcases up 4 flights of stairs to reach the first floor. The staircases are half the width of the other multistory and seem to be built as just a fire escape. All windows have been boarded up due to a lack of window frames and glass.


Only the first floor is open


The pay barriers are on the first floor

Last edited by LTNman; 22nd Aug 2019 at 11:45.
LTNman is online now  
Old 22nd Aug 2019, 11:46
  #2799 (permalink)  
 
Join Date: Aug 2014
Location: Outer London
Age: 43
Posts: 600
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Spanish eyes
Remember Waterford when that ended up at Southend the passengers did not follow. Might be different now if there are no alternate routes.
Sibiu is not Waterford, and times have moved on. Waterford moved over prematurely before the new terminal was open. It required a bus transfer from the old terminal to Rochford Station. Perhaps if they’d held back a year things would have been different. Routes and airlines at SEN have come and gone but ventures towards the east of Europe have been highly successful to date, certainly in terms of passenger numbers. I have no reason to doubt Sibiu would be any different.
AirportPlanner1 is offline  
Old 22nd Aug 2019, 13:09
  #2800 (permalink)  
 
Join Date: Apr 2002
Location: Luton
Posts: 156
Likes: 0
Received 0 Likes on 0 Posts
The issue for passengers departing St Pancras is do they use the high level platforms for the half hourly non stop service or the underground platforms for the 4 trains an hour semi fast service. In many cases the semi fast option will still be quicker as there will be less platform waiting
Same kind of Dilemma going south at Victoria where you can get the Southern or the Gatwick express.
My guess is airport passengers will naturally gravitate to the 'express' service as they do at Gatwick, without realising the same TOC operates a far cheaper 2 stop service, its just painted green and has a different platform.
G-AZUK is offline  

Thread Tools
Search this Thread

Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.