There are enough pressure groups, MP’s and other councils to make sure Luton Borough Council does not turn a blind eye as being in breach of planning permission is serious. Of course the council can apply to itself to increase that limit but it would cause a major stink as once again the benefactor would be the council.
One group is on 3CR just after 5 about aircraft noise.
One group is on 3CR just after 5 about aircraft noise.
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,792
Likes: 0
Received 0 Likes
on
0 Posts
There are enough pressure groups, MP’s and other councils to make sure Luton Borough Council does not turn a blind eye as being in breach of planning permission is serious. Of course the council can apply to itself to increase that limit but it would cause a major stink as once again the benefactor would be the council.
One group is on 3CR just after 5 about aircraft noise.
One group is on 3CR just after 5 about aircraft noise.
Did it not take just over 6 months to get approval from 12M to 18M from Government before?
Join Date: Jul 2002
Location: In the sticks
Posts: 9,846
Likes: 0
Received 0 Likes
on
0 Posts
12-18 million was again decided by the council. 18-32 to be decided by government while 32-36 or 38 million to be decided by the council.
There is a plan to go from 18 to 22 million if the government says no to 32 million but no one is meant to know about that plan yet. Might be the case that they will indeed go for 22 million as a short term fix to add capacity with mods to the existing terminal, a new pair and apron on the temporary drop off zone. This is part of the bigger planning application but it could well be separated.
There is a plan to go from 18 to 22 million if the government says no to 32 million but no one is meant to know about that plan yet. Might be the case that they will indeed go for 22 million as a short term fix to add capacity with mods to the existing terminal, a new pair and apron on the temporary drop off zone. This is part of the bigger planning application but it could well be separated.
Join Date: Jul 2007
Location: No fixed abode
Posts: 792
Likes: 0
Received 0 Likes
on
0 Posts
Join Date: Jul 2002
Location: In the sticks
Posts: 9,846
Likes: 0
Received 0 Likes
on
0 Posts
If there is it isn’t enforced. A coupe of months ago I reported the terminal for overcrowding to Beds Fire Service and even supplied a video of an airside terminal evacuation but they never got back to me. Just waiting for the first crush during a real emergency when people are in a panic mode so I can say I told you so at an inquest.
https://www.thesun.co.uk/news/930179...ed-fire-alarm/
When the builders where in some fire exits at the front of the terminal were blocked for months.
https://www.thesun.co.uk/news/930179...ed-fire-alarm/
When the builders where in some fire exits at the front of the terminal were blocked for months.
Last edited by LTNman; 19th Jul 2019 at 21:29.
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,792
Likes: 0
Received 0 Likes
on
0 Posts
Join Date: Jul 2002
Location: In the sticks
Posts: 9,846
Likes: 0
Received 0 Likes
on
0 Posts
The NAT chart doesn't show the deicing pads which are all floodlit with a row of 4 lighting towers. Looks like the de-icing pads are part of a super wide taxiway as F3 is shown on what would be the stand. Looks like if an aircraft is being de-iced then another aircraft does not have enough room to pass although I could be wrong. Certainly there are no stand markings. New opportunity to handle a few more diverts if pressed.
Last edited by LTNman; 20th Jul 2019 at 15:14.
Vueling will cease its Amsterdam service on 13th August. Thereafter all flights will be flown by Level. So capacity increases as an A320 is replaced by an A321.
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,792
Likes: 0
Received 0 Likes
on
0 Posts
The NAT chart doesn't show the deicing pads which are all floodlit with a row of 4 lighting towers. Looks like the de-icing pads are part of a super wide taxiway as F3 is shown on what would be the stand. Looks like if an aircraft is being de-iced then another aircraft does not have enough room to pass although I could be wrong. Certainly there are no stand markings. New opportunity to handle a few more diverts if pressed.
Can't see much drainage but this might just be the angle.
Those car owners are going to love all that deicer spray come the winter!
Join Date: Jul 2007
Location: No fixed abode
Posts: 792
Likes: 0
Received 0 Likes
on
0 Posts
Stands 1R-8 to be reconstructed ? what’s this about?
New South East stands split build of a two and six pack ?
cost £22 million.
Also Tender out to replace both escalators from security to Duty Free next Spring
New South East stands split build of a two and six pack ?
cost £22 million.
Also Tender out to replace both escalators from security to Duty Free next Spring
Join Date: Jul 2007
Location: No fixed abode
Posts: 792
Likes: 0
Received 0 Likes
on
0 Posts
According to the plans the drainage channel is on the western edge of the taxiway so probably can’t see it from the vantage point of the photos
Join Date: Jul 2002
Location: In the sticks
Posts: 9,846
Likes: 0
Received 0 Likes
on
0 Posts
The drop off zone which is south east would only take 4 stands. Interesting to know where a 2 and 6 stand apron will go as that is not part of the consultation to expand the airport. Would they really build an apron on the wrong side of 2 live taxiways for passenger use?
Join Date: Jul 2002
Location: In the sticks
Posts: 9,846
Likes: 0
Received 0 Likes
on
0 Posts
The present stand count, terminal and general infrastructure were designed for 18 million passengers. No point in building more stands if the terminal can't cope but now we have another 8 stands. So what does that tell you?
Join Date: Jul 2007
Location: No fixed abode
Posts: 792
Likes: 0
Received 0 Likes
on
0 Posts
Just looking at the map, there are very few places that a two stand area would fit perfectly
Could it be that this is the area by the run up bay and not the current drop off area.Have plans totally changed?
Strange that Stands 1-9 need restrengthening, do they have to meet a new standard or are they showing physical signs of cracking?