Airlines, Airports & Routes Topics about airports, routes and airline business.

Luton-9

Old 23rd May 2018, 18:19
  #1261 (permalink)  
 
Join Date: Apr 2009
Location: Luton
Posts: 548
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by LTNman
Also is Delta still El-AL 787 friendly? Seems to be a bit of wingtip shrinkage in the last year.
Standard 777-200 (as operated by El Al) quoted wingspan is 199ft 11 inches.
787-8 and 787-9 quoted wingspan 197ft 4 inches.
cj241101 is offline  
Old 23rd May 2018, 19:02
  #1262 (permalink)  
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,843
Likes: 0
Received 0 Likes on 0 Posts
I have noticed recently that Wizz and Easyjet push and then taxi to the Southern Apron and wait for prolonged periods with engines running. I assume they are waiting for their slot but it doesn't help the stats.
LTNman is offline  
Old 23rd May 2018, 19:23
  #1263 (permalink)  
 
Join Date: Apr 2009
Location: Luton
Posts: 548
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by LTNman
I have noticed recently that Wizz and Easyjet push and then taxi to the Southern Apron and wait for prolonged periods with engines running. I assume they are waiting for their slot but it doesn't help the stats.
It means they are ready should their slot come forward. Better than waiting on the main apron when your pushback team gets called to attend another aircraft with an earlier slot, then find yourself with no pushback team when your own slot comes forward. Probably it also helps the airlines OTP if not the airports.

Last edited by cj241101; 23rd May 2018 at 19:38.
cj241101 is offline  
Old 23rd May 2018, 20:20
  #1264 (permalink)  
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,843
Likes: 0
Received 0 Likes on 0 Posts
I had another butchers at the carbuncle that has been bolted over one of the entrances now that all the panels are up. Seems to be made from stretched canvas in various shades of off white that looks a tad dirty in places already. Aesthetically it would have been better if the colour matched the rest of the building. I have come to the conclusion that LLAOL, who is funding the expansion to 18 million rather than LLAL who is funding MS2 and the DART has run out of money as the project is already 60% over budget. They were probably obliged to fit a canopy so this is their effort to meet their obligation. In reality it will be just used as a smokers shelter so passengers will be fighting their way through a haze as it serves no other purpose.

As for the mystery wall? With a curve now going in by the terminal it would seem that if a passenger walks from the drop off area and keeps right they will go up a slope. If they keep to the left by the bus station they will use stairs. The second entrance with the carbuncle will be initially served by a temporary slope from the bus station until the rest of the wall is complete.
LTNman is offline  
Old 24th May 2018, 09:48
  #1265 (permalink)  
 
Join Date: Feb 2007
Location: Luton
Posts: 447
Received 1 Like on 1 Post
It's probably the same now as it was when I was there. But easy, especially, used to push and remote park because it proved to the punters down the back that the delay was not the airlines fault, and the stats then showed that they pushed on schedule.
Level bust is offline  
Old 24th May 2018, 12:27
  #1266 (permalink)  
 
Join Date: Sep 2009
Location: 285ft agl
Age: 35
Posts: 61
Likes: 0
Received 0 Likes on 0 Posts
Do you have any comment on how taxiway foxtrot will work
Foxtrot will certainly help create additional flexibility which will enable us to flow the traffic better and allow A5 not to become blocked. It will also allow us to manipulate the traffic order where possible to allow the most optimal departure order to ensure the runway is being used as efficiently as possible. That will also come with the Alpha extension which is either going to be done at the same time a F or afterwards. IMO A extension should come first if possible. The airport also wish to use F as the re-mote de-icing area during winter months (additional rigs will be available this coming winter...)

It'll also be used for remote holding for CTOT's to allow airlines to say they pushed back on time...

Have you ever wondered why so many clearance calls go out on the wrong freq?
After being opened for around 30 mins, no, that will happen. After being opened for an hour and/or being called by an aircraft that landed with delivery open but they still call GMC. Or when you get called at 1600 and told there's no answer on delivery.....

You do make a fair point regarding the order in which the frequencies are opened however it's been like that for a few years now (unless delivery isn't opened). It's worth looking at though.

Auto frequency changes on departure and when exiting the runway on landing work extremely well at numerous far more complex airports than Luton. Try asking a base Captain for a jump seat on a double AMS and see for yourself how it works.
I'll take up that offer any day...

I'd be interested in auto frequency changes however I don't think it's something we'd locally push back on, it would be the LTMA for various reasons.

I’ve been based at Luton a very long time, I’m not holding my breath for any changes.
Come over for a cuppa.
Scrotchidson is offline  
Old 25th May 2018, 09:50
  #1267 (permalink)  
dvc
 
Join Date: May 2018
Location: Luton
Posts: 59
Likes: 0
Received 0 Likes on 0 Posts
Menzies strike postponed.
dvc is offline  
Old 25th May 2018, 20:30
  #1268 (permalink)  
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,843
Likes: 0
Received 0 Likes on 0 Posts
The second entrance with its canopy is now open to the public. As predicted the canopy is a magnet for smokers and it isn't even raining despite no smoking signs being taped to the posts holding the canopy up.

Work has started on the demolition of the walkway to what was the short term car park. Inside the walkway the concrete floor is being dug up while outside two large machines are waiting to tear the structure down. Already one machine has had a little poke at the structure as a small piece of the walkway has a gash in it.
LTNman is offline  
Old 26th May 2018, 00:08
  #1269 (permalink)  
 
Join Date: Nov 2001
Location: London Whipsnade Wildlife Park
Posts: 5,038
Likes: 0
Received 0 Likes on 0 Posts
Grrr

Originally Posted by LTNman
Probably designed out as it was a rubbish idea. An additional tunnel would put traffic back on local roads as was the original route back in the 80's. The whole idea of New Airport Way and Airport Way was to take traffic way from local roads and housing estates.
You are forgetting that the original plan also had a tunnel to what was going to be a huge investment by Wigmore. Why would the traffic affect local roads and estates? Very odd comment as the plan was to develop a new road back down to what was the Ibis roundabout. A circular flow of traffic. To be honest, the newly proposed road to the planned business park seems to run a similar route.

Also cost engineered out was the people mover from the Parkway station and the extensive check in facilities planned for the new station. A cul-de-sac tinminal was effectively the lowest cost option and the central area was not designed to take the huge numbers of passengers that the area currently handles. Oh and the original tinminal should of had vast glass areas, they were replaced by tin sheeting!

However many complaints are raised about the low cost nature of current developments, they only mirror what occurred during the mid 1990s, albeit on a smaller scale. Most of the reasoning back then was an unwillingness by the then Government to permit local authorities from borrowing large sums for infrastructure investments. LBC faced the prospect of needing investment into their airport, but limited by HM Govt on the amount permitted to be borrowed, thus the unique Concession Agreement which has rewarded LBC handsomely since 1997.

Having sat in many meetings between the airport and LBC, Government policy dictated that Luton was not allowed to compete with what back then was a huge financial gamble at Stansted. The monopolistic activities at the time by the BAA would be outlawed today. LBC did an incredible job against a neighbour being subsidised by their operations elsewhere around London. LBC not only had to battle Govt policy in the early 1970s and Gatwick, 20 years later they faced similar from Stansted.

All in all, LBC were correct in not selling, simply as the sustained concession income over the last 21 years completely outweighs the potential one off payment that selling up would have given. For me, the saddest part of the original concession agreement, was watching Frankfurt Airport representatives pack up and leave before the final three potential operators were announced. I had a long conversation with one of the managers sent over and it was clear that what became Fraport would have invested massively from 1998. Duty Free was being abolished and Frankfurt considered Luton to be a potentially long term income stream helping to replace the effects of losing the tax free goods income. Copenhagen did make the last 3, but I was not impressed hugely with their business plans long term, but their senior management were good and honest. They went on to take control of Newcastle.

Buster the Bear is offline  
Old 26th May 2018, 05:58
  #1270 (permalink)  
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,843
Likes: 0
Received 0 Likes on 0 Posts
Snoop

I never know about a second tunnel connecting to a new road through the back of the airport.

Next month the airport will put out for consultation a selection of plans and ideas to expand the airport outside its boundary for up to 38 million passengers both to the north and south of the runway. As I have mentioned on many occasions there is a large chunk of land south of the runway that is inside the Luton town boundary that is flat and level with the runway by Someries Castle.
LTNman is offline  
Old 26th May 2018, 09:24
  #1271 (permalink)  
 
Join Date: Feb 2012
Location: Luton
Posts: 402
Likes: 0
Received 0 Likes on 0 Posts
South of runway

There are two parcels of land south of the runway. If the airport could acquire the land between the two-
that would be beneficial.
Lee Baker Street is offline  
Old 26th May 2018, 09:38
  #1272 (permalink)  
 
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,783
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by LTNman
As I have mentioned on many occasions there is a large chunk of land south of the runway that is inside the Luton town boundary that is flat and level with the runway by Someries Castle.
Ideal to move the FBOs if nothing else but SIG have just spend a huge amount of money redeveloping their facilities but we are used to spending large somes then only tearing it down a few years later! They themselves buy facilities all over the world and redevelop. It could also help to keep more of the Gulfstream business at Luton. If Harrods was moved their customers would have better access and it could enable Foxtrot to go full length which would remove the pushback problem from the 8 pack and then make better use of land to the East.
The trouble with VVIP though is the amount of money it generated for the airport, a couple of G650s sitting on a stand all day vs one being used 7 / 8 times by a A320.

BTW Northolt runway now to be closed July to November/December, will it be OXD, FAB or Luton who picks all that traffic up?
pabely is offline  
Old 26th May 2018, 09:39
  #1273 (permalink)  
 
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,783
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Lee Baker Street
There are two parcels of land south of the runway. If the airport could acquire the land between the two-
that would be beneficial.
As if Herts would be helpful in that respect!
pabely is offline  
Old 26th May 2018, 09:41
  #1274 (permalink)  
 
Join Date: Jan 2014
Location: Daws Heath Essex
Posts: 446
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by pabely
Ideal to move the FBOs if nothing else but SIG have just spend a huge amount of money redeveloping their facilities but we are used to spending large somes then only tearing it down a few years later! They themselves buy facilities all over the world and redevelop. It could also help to keep more of the Gulfstream business at Luton. If Harrods was moved their customers would have better access and it could enable Foxtrot to go full length which would remove the pushback problem from the 8 pack and then make better use of land to the East.
The trouble with VVIP though is the amount of money it generated for the airport, a couple of G650s sitting on a stand all day vs one being used 7 / 8 times by a A320.

BTW Northolt runway now to be closed July to November/December, will it be OXD, FAB or Luton who picks all that traffic up?
Perhaps SEN may even pick up the odd crumb!! What do you think?
Planespeaking is offline  
Old 26th May 2018, 09:43
  #1275 (permalink)  
dvc
 
Join Date: May 2018
Location: Luton
Posts: 59
Likes: 0
Received 0 Likes on 0 Posts
Signature wants to use Cranfield for the long staying aircraft due to lack of space in Luton. Apparently locals are already complaining about the noise it may generate
dvc is offline  
Old 26th May 2018, 09:57
  #1276 (permalink)  
 
Join Date: Jan 2005
Location: Not so many places currently
Age: 60
Posts: 3,783
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Planespeaking

Perhaps SEN may even pick up the odd crumb!! What do you think?
Now let me think, the reason I currently fly NHT is because my customers want to go to West London/Middlesex or the Tech corridor M4/A4, what is the best alternative, oh yes, somewhere in Essex! Sorry mate, no!
pabely is offline  
Old 26th May 2018, 10:07
  #1277 (permalink)  
 
Join Date: Jul 2003
Location: Under the flight path
Posts: 2,625
Received 11 Likes on 4 Posts
From an article in today's Telegraph based on an interview with Josef Varadi, Wizz Air's CEO:

"Wizz Air now occupies nearly 40pc of Luton Airport’s capacity after launching a base there last year with seven planes. The carrier has its sights set on overtaking EasyJet at Luton, the only airline to have a larger presence at the airport."
LGS6753 is offline  
Old 26th May 2018, 10:26
  #1278 (permalink)  
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,843
Likes: 0
Received 0 Likes on 0 Posts
The trouble with VVIP though is the amount of money it generated for the airport, a couple of G650s sitting on a stand all day vs one being used 7 / 8 times by a A320.

BTW Northolt runway now to be closed July to November/December, will it be OXD, FAB or Luton who picks all that traffic up?
Luton is apparently already 20% down on biz jet movements compared to last year and that is before the 4 month summer curfew cuts in.

The long term future for Signature and Harrods is not rosy at Luton with the airport always looking to expand its passenger operations over biz jet movements. Issues over parking, slots and now limited hours are all taking their toll.
LTNman is offline  
Old 26th May 2018, 10:48
  #1279 (permalink)  
 
Join Date: Jul 2007
Location: No fixed abode
Posts: 791
Likes: 0
Received 0 Likes on 0 Posts
Will certainly be interesting to see the plans when they come out.
What are the feelings about some of the Hangars disappearing or being relocated?
If they want to expand to the North I can see, with the exception of maybe Hangar 125 , the rest going and the land being used up to the perimeter of the new road if and when it is built.
i really can't see the south of the runway being used for passenger operations, just extra concrete, Hangars and maybe cargo but then there is the problem of access and a new road being built.
But heh what do I know!!
Falcon666 is offline  
Old 26th May 2018, 10:51
  #1280 (permalink)  
 
Join Date: Feb 2007
Location: Luton
Age: 46
Posts: 4
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Airbrake
Auto frequency changes. Have you ever wondered why so many clearance calls go out on the wrong freq? It’s a genuine question. Part of the problem is that pre 0600L ground is closed so everything is done on Twr. Then ground opens and twr tells everybody to go to ground for ATC clearances and push, start. Then at some point delivery opens and ground tells everybody to go there. Is it a surprise that at some point somebody hasn’t kept up with the rearranging of the deck chairs? How about opening delivery at 0530L? I know that will never happen because of staffing levels and costs. That is a Luton problem
Airbrake
I have wondered this many many times. When I fly I check the ATIS to ensure I've got the latest information just before making initial contact. It is always possible for the ATIS to have changed just after having listened to it but this would be a pretty infrequent circumstance and I wouldn't have thought it would explain the amount of incorrect calls you refer to.
Maybe a change of custom and practice / SOPs to get aircrew to get the latest info before initial contract could be a more practical solution than manning frequencies for longer periods (when there may not necessarily be the traffic demand to do so)?

Crispo is offline  

Thread Tools
Search this Thread

Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.