Seems like the airport can’t wait for the opening of the replacement land side retail outlets and have given notice to the likes of M&S to close, which will cause redundancies. This is because the airport want to speed up the building work.
This news from someone who is not at all happy
This news from someone who is not at all happy
Join Date: Jul 2007
Location: No fixed abode
Posts: 792
Likes: 0
Received 0 Likes
on
0 Posts
Sounds like very poor project management.Do you know how long a gap we are talking about? Presumably many months!
Costa were told end of March for their move to Landside, wonder if that's still on?
On a lighter note just watched Easy2053departed and then returned 30 mins later after, according to FR24, ploughing around Bedfordshire at 160knts at 0ft that must have been some trip
Costa were told end of March for their move to Landside, wonder if that's still on?
On a lighter note just watched Easy2053departed and then returned 30 mins later after, according to FR24, ploughing around Bedfordshire at 160knts at 0ft that must have been some trip
Join Date: Jul 2002
Location: In the sticks
Posts: 9,846
Likes: 0
Received 0 Likes
on
0 Posts
There is still a massive amount of work that hasn’t even been started yet but as retail is in both the arrivals area and by the check-in desks I don’t know if both areas will be shut down before the terminal extension opens.
Join Date: Jul 2002
Location: In the sticks
Posts: 9,846
Likes: 0
Received 0 Likes
on
0 Posts
These are located in the departure lounge extension between the duty free shop and the main part of the existing departure lounge. Empty shops are not going to easy congestion in the departure lounge though.
In the meantime the temporary drop off zone is taking shape which will have 5 lanes with the exit barriers being moved close by. This is almost a mock up of the ground floor of the second multistory being started soon. With the exit barriers so close to the drop off lanes any tailbacks will have a major impact on the drop off zone.
Last summer the barriers had to be lifted often as the tailbacks would extend all the way around the CTA to where the drop off zone was located.
In the meantime the temporary drop off zone is taking shape which will have 5 lanes with the exit barriers being moved close by. This is almost a mock up of the ground floor of the second multistory being started soon. With the exit barriers so close to the drop off lanes any tailbacks will have a major impact on the drop off zone.
Last summer the barriers had to be lifted often as the tailbacks would extend all the way around the CTA to where the drop off zone was located.
Last edited by LTNman; 16th Feb 2018 at 10:56.
Paxing All Over The World
LTNman
Surely, you're not suggesting that LLA have learnt nothing and are about to repeat their mistakes?
With the exit barriers so close to the drop off lanes any tailbacks will have a major impact on the drop off zone.
Join Date: Jul 2002
Location: In the sticks
Posts: 9,846
Likes: 0
Received 0 Likes
on
0 Posts
Deja vu apart from the barriers this time will be just outside the lanes. I'm thinking it is a trial run for their final solution. Get it wrong next time and there is no going back but I note passengers will still have to use pedestrian crossings to get across each lane.
Looking at the first picture below is a reminder of the size of the terminal infill.
Looking at the first picture below is a reminder of the size of the terminal infill.
Last edited by LTNman; 16th Feb 2018 at 19:03.
Join Date: Jul 2002
Location: In the sticks
Posts: 9,846
Likes: 0
Received 0 Likes
on
0 Posts
Construction update
It has been a while since I did one of these but there is activity to be seen again although nothing regarding the DART construction that should be under way by now.
The lifts in the building that used to go to the short term car park appear to be being removed. Looking at the construction site drawing the whole core and the link bridge are going to be removed. Highlighted in red is the core building that is in the way despite only being completed and opened around 15 months ago. In another drawing this location is part of the exit ramp from the car park.
As can be seen work has been started on the foundations of I assume the second multistory but confusingly the drilling machine is putting in holes that are being filled with reinforced concrete only 2 metres apart so maybe it is for the ramp as the first floor of the multistory will be accessed from around this point.
The new multistory hugs the existing road and is much larger than the existing multistory.
A subway will be constructed across the road but the subway will be at the existing land level so the road will be raised to cross the subway. Work seems to have started on a temporary road to allow the existing road to be raised. Also seen is the core that looks like it will be removed.
Meanwhile on the other side of the airport work continues on a very modest expansion of the ground floor immigration hall as a roof has been put in on the first floor extension above the hall which I think will be a shop and a link to the new walkway.
The lifts in the building that used to go to the short term car park appear to be being removed. Looking at the construction site drawing the whole core and the link bridge are going to be removed. Highlighted in red is the core building that is in the way despite only being completed and opened around 15 months ago. In another drawing this location is part of the exit ramp from the car park.
As can be seen work has been started on the foundations of I assume the second multistory but confusingly the drilling machine is putting in holes that are being filled with reinforced concrete only 2 metres apart so maybe it is for the ramp as the first floor of the multistory will be accessed from around this point.
The new multistory hugs the existing road and is much larger than the existing multistory.
A subway will be constructed across the road but the subway will be at the existing land level so the road will be raised to cross the subway. Work seems to have started on a temporary road to allow the existing road to be raised. Also seen is the core that looks like it will be removed.
Meanwhile on the other side of the airport work continues on a very modest expansion of the ground floor immigration hall as a roof has been put in on the first floor extension above the hall which I think will be a shop and a link to the new walkway.
Last edited by LTNman; 20th Feb 2018 at 17:19.
Join Date: Nov 2001
Location: London Whipsnade Wildlife Park
Posts: 5,038
Likes: 0
Received 0 Likes
on
0 Posts
I was told that the lifts that are now to be removed, were roumered to be meant for interior installation and therefore not compatible with the British weather. I know they were allegedly failing when it rained!
Join Date: Feb 2012
Location: Luton
Posts: 402
Likes: 0
Received 0 Likes
on
0 Posts
17.3 Million plus by December 31st 2018!
Don't worry about it LTNman, but yes it has already been mentioned in the thread previously. Of course I can understand your anxiety as when I announced a new route (that I was not aware of having already been disclosed) all hell broke out! But hey, you and me probably have far more knowledge of the airport than most in this forum!
Join Date: Nov 2001
Location: London Whipsnade Wildlife Park
Posts: 5,038
Likes: 0
Received 0 Likes
on
0 Posts
I still find it interesting that an airline like Sun Express which is a joint venture by Luftfhansa and Turkish airlines uses Luton and not Stansted which has greater Lufthansa links (Euro Wings).
Join Date: Nov 2001
Location: London Whipsnade Wildlife Park
Posts: 5,038
Likes: 0
Received 0 Likes
on
0 Posts
Join Date: Jul 2002
Location: In the sticks
Posts: 9,846
Likes: 0
Received 0 Likes
on
0 Posts
With the latest set of foundations being placed right by the ring road it is now looking unlikely that it has anything to do with the second multistory. I am now thinking it might be for a passenger footbridge as crossing the ring road is not an option. It will all depend on which direction cars enter the temporary drop off zone.
Also all the fairground kiosks have been moved. 3 now occupy bus bays with the 4th by the drop off zone. This is a temporary move but the question is why did they have to move? Looks like another project is about to begin.
Also all the fairground kiosks have been moved. 3 now occupy bus bays with the 4th by the drop off zone. This is a temporary move but the question is why did they have to move? Looks like another project is about to begin.