Originally Posted by good egg
This feels like Groundhog Day all over. Same answers (from me, my personal opinion) as above/as stated in other threads on this topic.
I don't know what the ultimate objective might be, if there is one. I can speculate, like anyone can. I could offer a ton of reasons why the current VCR is not fit for purpose "going forward" - for want of a better term!
But each battle should be weighed up on the pros and cons.
There's little point in limiting progress for the sake of it. Where the benefit outweighs the cost then progress should be made. When the benefit doesn't outweigh the cost then a line has to be drawn.
Where that line is is disputable on a subjective front. On an objective front it is more measurable.
Both measures are important, of course, but the balance of both - in particular with regards to safety should surely rule?
No airport, no ANSP, no regulator would accept anything less, and nor should it.
Safety is always the priority, despite market pressures.

Safety is assured on the probability of failure, and what the mitigations are for said failure - which is why current systems operate the way they do. Until a system is proved reliable it isn't accepted. Hence the time it takes for a system to be tested until it is proved reliable (and, that in the case of failure, the fallback measures are safe).
I am sorry if I have constructed "Groundhog Day", but I didn't really see the earlier posts. I will endeavour to read them.
You say that nothing in this proposition indicates anything of the sort ie reducing staff by getting one ATCO to do two ATCOs' work. Maybe not, but I struggle to see the possible benefits & savings if it does not involve cutting staff.
As you say, "there may be a ton of reasons why the current VCR is not fit for purpose". But, why can't either a new VCR be built, or the remote operation be exercised from, within the LCY complex?
I don't wish to "limit progress for the sake of it", but the whole ethos of ATC, as I was educated in it, appears to be under threat here. Either principles have changed drastically, or these principles have been abandoned (apparently under cost pressures). If so, I cannot imagine why they should have been & I am surprised that a body such as the Guild Of ATC has not been active in trying to uphold them. Does it still exist ?
"Until a system is proved reliable, it isn't accepted". I have to ask exactly how was this proof obtained ?
It is difficult to assess the benefits from my viewpoint - although, I accept that things may have moved on since my day. If so, I guess that I will have to accept that I am just a dinosaur !