Originally Posted by
Sober Lark
Are you serious they have built a stand they can't use for 4 years?
In theory it could land on RWY 10 as the taxiways are wide enough at the 28 end and at the right angles for it to use. The exits off 28 onto the bravos are too tight and would need to be filleted, which they don't plan on doing for potentially 1 service a day
AFAIK.
So as things stand it can only use 10, which is a fat load of good at 240/35 gusting 50 for half the winter