PPRuNe Forums - View Single Post - CL604 Cobham SAR jobs
View Single Post
Old 19th Feb 2016, 03:40
  #57 (permalink)  
Excia
 
Join Date: Jun 2013
Location: In a house
Age: 52
Posts: 7
Likes: 0
Received 0 Likes on 0 Posts
Capt Bloggs

I can appreciate the logistics required to get a 30 minute response, not that difficult. My point was can the CL 604 be left with full fuel on the hard stand to meet the endurance required for the contract? Another interesting point would be is the cargo door able to deploy the large diesel pump. The tender documents were very specific with respect to items needing to be deployed and all bidders needed to fulfil that in order to proceed. Again though I have no idea as to the size of the door in the 604, just what the tender requirements were for drop equipment deployment.
Excia is offline