Having the aircraft ready to ship and having them operational isn't quite the same thing but we will have to wait and see - I had heard there was a further delay in the icing clearance due to the addition of an external handhold........I believe 1564 Flt are readying the contingency plans to extend if required - some fudging required with the Design Authority apparently.