PPRuNe Forums - View Single Post - UK SAR 2013 privatisation: the new thread
Old 18th Nov 2015, 20:23
  #2405 (permalink)  
jimf671
 
Join Date: Nov 2009
Location: Inverness-shire, Ross-shire
Posts: 1,460
Received 23 Likes on 17 Posts
Originally Posted by Variable Load
From Section 1 of the RFM:
Slope landing limits are 10° nose up or down slope, 13° left or right side of the aircraft up slope.

And a contract requirement at Schedule 2.1 (Specification), 4.1.1.1.2, for 10 degrees in any direction.
jimf671 is offline