Originally Posted by
EEngr
All you lose with one generator inop is the ability to continue a normal autoland in the event of another generator (or its associated engine source) loss.
Not sure what you mean by "normal autoland".
Our QRH CAT II/III briefing page for shows CAT II/III fail-passive with two electrical power sources(ie. two generators lost). It is not monitored by the ASA. I would have assumed that this would be LAND 2 meaning autoland capable. Are you saying that the ASA will say NO AUTOLAND?
I think you will have autoland but not LAND 3 fail-operational and the electrical system will re-arrange itself accordingly.