PPRuNe Forums - View Single Post - 744 AC Bus Isolation on Approach
View Single Post
Old 10th Apr 2015, 15:51
  #6 (permalink)  
EEngr
 
Join Date: Jan 2011
Location: Seattle
Posts: 715
Likes: 0
Received 3 Likes on 2 Posts
there are no MEL restrictions on approaches with one gen inop.
For generators 1, 2, or 3 inop, number 4 will pick up that load bus. For #4 inop, the #4 load bus will be powered by #3 (if I recall correctly). All you lose with one generator inop is the ability to continue a normal autoland in the event of another generator (or its associated engine source) loss.
EEngr is offline