F-35C Hook Testing Delayed for 2 Months from April - Nose Bleed

...STATEMENT OF: Lt General Christopher C. Bogdan to SASC Program Executive Officer F-35 02 Apr 2014

http://www.airforcemag.com/testimony...0214bogdan.pdf (100Kb)

"...Program Accomplishments in the Last Year
The F-35 program team achieved a number of accomplishments in 2013, including delivery of 35 aircraft; rolling-out of the 100th jet from the production facility in Fort Worth; completion of the Block 3 Critical Design Review; announcing the decision to cease development of an alternate Helmet Mounted Display System (HMDS); and resolving lingering technical design shortfalls to include the F-35C Arresting Hook, Night / Instrument (IMC), Fuel Dump, and Lightning Protection....

...The program also saw improvements with the redesigned F-35C arresting hook system on our CF-3 aircraft. In January 2014, the F-35 team accomplished 36 for 36 successful roll-in arrestment tests at Lakehurst, NJ. The aircraft is now at Patuxent River where it is continuing its ship suitability testing. Thus far CF-3 accomplished 8 for 8 fly in arrestments while at Patuxent River; however, testing has been delayed for approximately 60 days as we discovered a minor nose gear issue. These tests are expected to lead to a certification of the F-35C for shipboard flight trials, which are planned to commence fourth quarter 2014.

The program has also made progress on the redesigned fuel dumping seal and port. The F-35 employs a unique fuel dumping port on the underside of the wings in order to maintain its stealthy signature. Early fuel dump testing revealed that fuel was collecting within the wing flaperon cove, which led to significant external fuel wetting and pooling of fuel at the wing/fuselage root. We redesigned the fuel dump port to more efficiently move fuel away from the wing surface and designed a new and improved flaperon seal to minimize fuel collecting in the cove. Fuel dump testing with the redesigned seal and port has been successful and we are incorporating the new design in all three variants...."