PPRuNe Forums - View Single Post - F-35 Cancelled, then what ?
View Single Post
Old 3rd Apr 2013, 18:39
  #1603 (permalink)  
SpazSinbad
 
Join Date: Jul 2008
Location: Australia OZ
Age: 75
Posts: 2,575
Likes: 0
Received 51 Likes on 45 Posts
A CURLy one

For 'PhilipG' and 'Rulebreaker': A few big ticket items [FMS in a building + reprogram centre building at least with costs] are included in the F-35 bid including other items for the use of. ACURL info for Oz/UK/other (CanUK?) reprogam centre cost below Korean info. The FMS cost may be somewhere else inferred from US costs lumped together.

Korea – F-35 Joint Strike Fighter Aircraft 03 Apr 2013
http://www.dsca.mil/pressreleases/36...orea_13-10.pdf (109Kb)

Quote:
"WASHINGTON, April 3, 2013 – The Defense Security Cooperation Agency notified Congress March 29 of a possible Foreign Military Sale to the Government of Korea for 60 F-35 Joint Strike Fighter Conventional Take Off and Landing (CTOL) aircraft and associated equipment, parts, training and logistical support for an estimated cost of $10.8 billion.

The Government of the Republic of Korea has requested a possible sale of (60) F-35 Joint Strike Fighter Conventional Take Off and Landing (CTOL) aircraft. Aircraft will be configured with the Pratt & Whitney F-135 engines, and (9) Pratt & Whitney F-135 engines are included as spares. Other aircraft equipment includes: Electronic Warfare Systems; Command, Control, Communication, Computer and Intelligence/Communication, Navigational and Identification (C4I/CNI); Autonomic Logistics Global Support System (ALGS); Autonomic Logistics Information System (ALIS); Full Mission Trainer; Weapons Employment Capability, and other Subsystems, Features, and Capabilities; F-35 unique infrared flares; reprogramming center; F-35 Performance Based Logistics. Also included: software development/integration, aircraft ferry and tanker support, support equipment, tools and test equipment, communication equipment, spares and repair parts, personnel training and training equipment, publications and technical documents, U.S. Government and contractor engineering and logistics personnel services, and other related elements of logistics and program support. The estimated cost is $10.8 billion...."
______________________

Management of Australia’s Air Combat Capability — F-35A Joint Strike Fighter Acquisition [ACURL = reprogramming center]

http://www.anao.gov.au/~/media/Files...06%20OCRed.pdf (4.7Mb)

Quote:
“...2.63 Mission data reprogramming for Australian, Canadian and United Kingdom F?35 aircraft is to be conducted at a yet-to-be-developed Australia–Canada–United Kingdom Reprogramming Laboratory (ACURL). The ACURL is currently planned to be located at Eglin Air Force Base in Florida, USA, and operated collaboratively by approximately 20 personnel from each of the ACURL partner nations, with the support of approximately 50 US personnel. The ACURL’s acquisition and sustainment costs are to be split equally between the ACURL partner nations.99

99 The United States will operate its own reprogramming laboratory for its own significantly larger F-35 fleets.

2.64 At the time of the audit, the NACC IPT was collaborating with Canada and the UK to develop a Statement of Requirements for the JSF Program Office to design and construct the ACURL. The NACC IPT was also developing a Statement of Requirements for Australian in-country reprogramming for unique capabilities not provided by the ACURL. The remaining elements of the situational-awareness system, such as F-35 sensor suite integration, dis-played data fusion, and development of the Helmet Mounted Display system, remained under close managerial scrutiny by the JSF Program Office....
&
“...4.8 As of 2008, the Partner Reprogramming Laboratory was estimated to cost some US$500 million (then-year dollars), and was scheduled for development between 2009 and 2017. Each partner nation committed US$610,000 as its share of costs for the first two years, with cost shares for remaining years yet to be determined. By June 2012, AIR 6000 spend under the Partner Reprogramming Laboratory Annex was US$620,000.

4.9 The Partner Reprogramming Laboratory for the Commonwealth partner nations (namely the UK, Canada and Australia) is to be known as the Australia–Canada–United Kingdom Reprogramming Laboratory (ACURL). A recent Non Advocate Review by the JSF Program Office has reaffirmed the requirement for reprogramming laboratories, and the JSF Program Office has initiated a design review process that will lead to a refined cost basis. The outcome of this activity, and therefore the final ACURL costs, will not be known until mid-2013. As at August 2012, the latest estimated cost of the ACURL was US$600 million....”

Last edited by SpazSinbad; 3rd Apr 2013 at 18:40. Reason: Formatting - what else
SpazSinbad is offline