PPRuNe Forums - View Single Post - British Future MPA
View Single Post
Old 5th Apr 2011, 16:49
  #136 (permalink)  
keesje
 
Join Date: Oct 2007
Location: netherlands
Age: 56
Posts: 769
Likes: 0
Received 0 Likes on 0 Posts
Modern Elmo: Keesje, here are some benchmark numbers for your design:
P-3C P-7A
Thanks Elmo, usefull information to determine the balance between the various variables. I think if anyone these days would come up with a design matching P3/Nimrod like capabilities and dimensions, Dod would say it's a good idea for 1985 and if he/she has followed developments during the last 20 years.

The tanker is a tanker, a ASW platform is ASW platform and an interceptor is an interceptor days are behind us. One of the reasons IMO the US aerospace lobby decided the USAF KC30 had to be killed is that a quick look at the aircrafts cargo/range and tonne-mile costs not only caused red alert in the KC767 department but also in the C-17 and KC-10/KC-Y departments. It would spoil the business as it has been for the last 50 years.

airsound: Apologies if this has been mentioned before - it's about the Libyan Coast Guard Vessel Vittoria firing on sundry merchant shipping on 28 March.
Hadn't seen it, IMO a clear sign of changing requirements. All those Harpoons, Exocets, torpedo's and nucleair charges have a use. But how many were used during the last 50 years, do they still have first priority?



Times and enemies are different. Big enemies became neighbours, small friends enemies.

http://farm3.static.flickr.com/2001/...c853928b_b.jpg


WillDAQ: I think you're overlooking development costs somewhat. There's little point in a fuel efficient aircraft if it costs twice as much to purchase. You're using a new design radical configuration which will be expensive to develop and all the small efficiency improvements in the world aren't going to make it financially viable compared to something like the P3, which we could buy off the shelf tomorrow.
Bigger aircraft cost more, specially if they are based on 50+ year old designs. Who will buy them for the next 40 years if they don't fit the requirements anyway? It just doesn't make sense.

Of course it wil take E8-10 billion Euro's to develop, but a lot of technology can be transferred from existing modern aircraft. Not everything needs to be reinvented. And doing a Nimrod, P3/P7 has the export potential of a Nimrod, P3/P7.

WillDAQ: Delivering fuel is a waste of time, this is what we've got tankers for. If we wanted to have a flexible multirole tanking capability we'd buy the add ons for A400M which would make it into service far sooner than a new build aircraft.
Just bring in the big tankers to refuel somewhere far away. What are the total costs of having that capability globally? Plus that capability for helicopters.. we just can't afford!

An aircraft bringing its own maintenance crew / maintenance tools, being able to refuel, function as a powerfull sensor for intelligence, able to perform a SAR and patrol with minimum adjustments saves money. Less transport, tanker, helihours, flight cycles, crews, specialized fleets, or smaller ones.



keesje is offline