Regarding the comment on operating costs, we worked out towards the end it was cheaper to undersling the loaded '30 under one of our BV234s and accept the lower operating cost!
And in passing I remember being in the Aberdeen crewroom when we were demo'ing the 30 to local customers. I did point out gently (and sotto voce) to the assembled pilots that my disposable payload to the Magnus in the 234 for the trip I was planning at the same time was higher than the MAUW of the 30...........