Are you saying zero is better than two? The V boats, like the R boats before them, provide one unit at immediate (15 minutes I think) notice, 24 hours a day, 365 days a year. The planning for CVF doesn't involve this sort of immediate readiness.

Meanwhile, more CVF equipment orders this week.

Tony Graham, head of Capital Ships within MOD's Defence Equipment and Support, attended the signing ceremony at Thales UK and said:

"The Aircraft Carrier Alliance has now placed sub-contracts for almost 40% of the total value of the materials and equipment required to build both ships, and we are pressing ahead into full scale production in the shipyards. The UK's future aircraft carriers are already off the drawing board and becoming a physical reality - the Queen Elizabeth Class."

The Glasgow-based Ticon Ltd UK will supply the insulation systems to be used throughout the ship which will prevent the transfer of noise and heat and protect the ship from the spread of fire.

Thales UK will cover both onboard and fleet-wide communications. Onboard it will ensure that that crew have access to information and are in communication with their colleagues across the ship at all times. The system will use internet networks to transmit data and voice in the same way as modern businesses and offices communicate. Fleet-wide (external to the ship) includes a high frequency system to provide long-range communications between the ship, other vessels and land bases.

The Bradford-based Ormandy Group will deliver equipment for treatment and supply of hot and cold fresh water to the accommodation spaces within the ships.


I am surprised there was no ceremony when the first steel was cut.