PPRuNe Forums - View Single Post - The Kerch Bridge Thread
View Single Post
Old 8th Oct 2022, 19:55
  #74 (permalink)  
Winemaker
 
Join Date: Dec 2017
Location: Yakima
Posts: 591
Received 209 Likes on 82 Posts
Originally Posted by Kent Based
Is there a significant incline on the railway as it reaches the steel arch section over the sealane? I'm wondering if that is why the fuel train is stationary there. Is there a need for an additional engine for that section? Or is there a weight/ vibration limit so a need stop while another train passes in the other direction?
Freight railroads want an incline of less than 1.5°. There won't be an abrupt or steep section. If you look at pictures of the bridge you can see the rail line is constant height.
Winemaker is offline