Originally Posted by
EchoMike62
Hello all,
I got the email almost 2 weeks ago that I passed the assessment. I would like to know how long you have to wait in the Holding Pool to get a start date, contract etc. and how long the type rating and line training takes?
I would be very happy to receive a reply
Thanks in advance
In my case, I waited 3 weeks (NTR CPT) to get the assessment result and then about a week to get the start date.
The type rating is about 6 weeks and then it's 3 weeks OCC (after a couple of weeks of home studying).
I am not sure about the line training