switch_on_lofty
As a result of this incident, I proposed that, whenever possible, and accepting that this would often be difficult, power on remaining engines should be ‘proved’ well before final approach. (BA777 LHR with two ‘good’ engines!)
If I recall correctly, in the Kegworth incident, incorrect information was given to the flight deck from cabin staff, or have I made that up?