A prototype or concept development aircraft needs to be able to fly to prove its designed systems and concepts. If the CAA didn’t approve the build, no new designs would fly in UK at all. Much of the snag-busting should have been done during simulations and ground runs, hopefully with every sensor you can shake a stick at. The only item not calculated might be the noise generated in flight....