PPRuNe Forums - View Single Post - Eight B787 pulled from service over structural issues
Old 10th Sep 2020, 13:33
  #32 (permalink)  
Superpilot
 
Join Date: May 2001
Location: England
Posts: 1,904
Likes: 0
Received 0 Likes on 0 Posts
Joe Sutter, the Lead Engineer of the first ever Jumbo was asked to cut 1000 engineers from Boeing so they could have enough funds to market and build the aircraft. He walked into the meeting room and said "not happening" then walked out knowing full well he was probably now earmarked for the sack himself. Had he caved into board pressure, and Boeing hired brand new, lower paid, unskilled engineers, the 747 would've probably been a monumental failure owing to unreliability and poor manufacturing. Especially so when you consider the lack of advancement in materials and technology at the time. Seems Boeing needs to go back to valuing human experience once again.
Superpilot is offline