M the M
I have two points:
1. The MOD did not procure the aircraft. They were chosen and bought by the contractor. It is just possible that they may have realised they need more than the initial purchase of 10.
2. I’ve said this countless times before but I’ll say it again. PC21 is overkill. It’s a great aircraft but not what was required for the job in hand.
BV