PPRuNe Forums - View Single Post - Ethiopian interim report on Max 737
View Single Post
Old 11th Mar 2020, 01:30
  #15 (permalink)  
Switchbait
 
Join Date: Dec 2015
Location: Aus
Posts: 125
Received 13 Likes on 9 Posts
Tobin

Even though it's an improvement, I still take issue with the wording here. How long do you execute step 4 for before moving to step 5? The words "until the aircraft is back in trim" do not appear. There is no precondition for step 5 (so, why not do it as soon as possible anyway?), and once step 5 is executed, step 4 is partially invalidated (because electric trim is unavailable).

"Control the airplane pitch attitude manually with control column and main electric trim as needed" is not equal to "Adjust pitch trim with main electric trim until flight path is stable and control column forces are reduced".[/QUOTE]


Sir, your assertion here that “you’d skip that step” is exactly why both airplanes speared in!

The primary role of the PF is to fly the bloody airplane! FLY THE AIRPLANE!!!!!!!!!

Why on earth would you “skip that step”??? The only step that matters at that point is controlling the flight path of the airplane. If you don’t do that, it doesn’t matter how many checklists you write.....
Switchbait is offline