PPRuNe Forums - View Single Post - Boeing, and FAA oversight
View Single Post
Old 10th Mar 2020, 09:02
  #359 (permalink)  
BDAttitude
 
Join Date: Apr 2019
Location: EDSP
Posts: 334
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Swiss51
So, what you say is that - if the FAA is correctly trying to get back control over the certification, and the wiring is found to be changed based on the findings - the wiring in all NG's would need to be changed as well?
See, the NG has been flying since mid of 90ies. If they had changed anything to the stab trim of the NG after 2007 they would have had to fulfill that requirement for the newly produced aircraft. I don't think they have though.
BDAttitude is offline