PPRuNe Forums - View Single Post - Isle of Man-2
Thread: Isle of Man-2
View Single Post
Old 6th Mar 2020, 11:50
  #321 (permalink)  
116d
 
Join Date: Sep 2012
Location: NW England
Posts: 148
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by pabely
The Seacat ìs in sheduled Dry Dock for annual checks I believe.
If that's the case then fair enough. It would be interesting to know if it would have been pressed into service had it not been in dry dock.

Typically both Manannan and Ben-my-Chree run alongside each other for a few weeks until after Easter, then the Ben goes off for its annual overhaul mid/late-April so both vessels are in service during the TT late-May/early-June and for the rest of the summer until late-October.
116d is offline