PPRuNe Forums - View Single Post - CAO 48.1 Transition
View Single Post
Old 3rd Nov 2019, 01:30
  #1 (permalink)  
SHAGGS
 
Join Date: May 1999
Location: Earth
Posts: 72
Likes: 0
Received 0 Likes on 0 Posts
CAO 48.1 Transition

Has anyone out there in GA started on their CAO 48.1 transition?

After reading most of the material on the CASA website, I am unable to find anything specifically with regards to how the OPS manual should be amended/developed. I’m looking specifically at Appendix 4 and the FRMS options. CASA have a lot of other helpful information on their website with regards to the other requirements that need to go with the transition, however the meat in the sandwich really is the OPS manual which they provide very little explanation on what it should look like. I don’t want to do a major manual re-write and submit it to only have it rejected because the manual doesn’t meet CASA’s expectations.

Anyone know if a template exists? They let people use a template for the Part 141 transition, wish they were doing the same with this, particularly given that every AOC holder will need to transition which will require an OPS manual amendment.

I have asked several people in CASA and no one can lead me in the right direction, hence my question here.
SHAGGS is offline