Originally Posted by
NutLoose
Well, it took the Germans about 4 months to repair the Mohne Dam, so allowing the UK PLC to hold an inquiry then repair the dam, what are we looking at, 2024 at the earliest?
But to be fair, we don't have enough slave labour (except the RAF Chinooks of course).