PPRuNe Forums - View Single Post - MAX’s Return Delayed by FAA Reevaluation of 737 Safety Procedures
Old 1st Aug 2019, 23:29
  #1692 (permalink)  
groundbum
 
Join Date: Dec 2001
Location: Leeds, UK
Posts: 281
Likes: 0
Received 0 Likes on 0 Posts
ref the FCC changes could be done quickly,in place and piecemeal.

It was this philosophy of quickly dropping MCAS on top of existing hardware, rather than doing a clean sheet design that started the whole bloodshed. Surely B would have learnt the lesson already, that critical changes need doing properly?

G
groundbum is offline