Originally Posted by
VentureGo
Reading through the Masterplan, it would suggest the extra length would relieve some restrictions on Loads, Allow engines and brakes to be operated more economically/less wear, - Although main reason for runway extension seems to be more related to route expansion to India, China and Atlanta USA, using A330-200/ -300, A350, Boeing 777 & 787 models. - Illustration of potential Route map with Aircraft capabilities is also in the link:
Figure 16 – Aircraft Range Performance on Extended Runway (Page 38):
https://www.newcastleairport.com/med...d-2019-lr_.pdf
Thanks.
If the current EK 777 is full with PAX does it severely limit the cargo?