Originally Posted by
pr00ne
Avionker,
And in 2019 the RAF is still involved in 1st, 2nd and 3rd line engineering, it still has RAF stewards and Chefs, and it has been contracting out services since before the second world war.
Battle Damage Repair. I'd have thought with a much smaller fleet very important, we used to have trained personnel on every sqn and stn plus a central team and centre of excellence. And now........... a line on a risk register?