Has the location of the aerial refuelling probe been finalised on the W-2085? Knowing how deep IAI go with repurposing existing frames I'm having trouble accepting the W-2085 shares much commonality with the corporate version other than the basics. Considering the high sticker price of this package deal I wouldn't be surprised if they came with a huge number of caveats on the what/when/how that can be done to them including swapping bits with more mortal G550's.