PPRuNe Forums - View Single Post - Boeing 737 Max Software Fixes Due to Lion Air Crash Delayed
Old 22nd Feb 2019, 16:03
  #107 (permalink)  
WillFlyForCheese
 
Join Date: Jul 2013
Location: In a Pineapple Under the Sea
Age: 61
Posts: 152
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by DaveReidUK
The engineer, according to the airline, was simply a flying spanner whose presence was not connected with the problems that had been encountered with the aircraft.
Right now - it’s pure speculation either way. The airline cannot say whether the engineer was or was not on the flight deck when things went bad. The CVR will reveal whether he was there - right now it’s all speculation.
WillFlyForCheese is offline