Originally Posted by
MightyGem
I won't comment on the delay to fixed wing aircraft and the obvious costs incurred in that delay but it looks from your link as though 11784 jobs were stood down before the arrival of the aircraft in just 7 months. Surely I've read that wrong: over 1600 jobs a month, 55 jobs a day. That can't be right, can it?