PPRuNe Forums - View Single Post - LATAM B773 complete electrical failure?
View Single Post
Old 23rd Dec 2018, 10:20
  #45 (permalink)  
Ian W
 
Join Date: Dec 2006
Location: Florida and wherever my laptop is
Posts: 1,350
Likes: 0
Received 0 Likes on 0 Posts
A lot depends on how far down the probability tails you want to proceed. In almost all FMEAs you get to conditions occur only where several highly improbables occur concurrently in a highly improbable sequence. It gets very difficult to persuade system developers to redesign systems to cope with probabilities in the 10^-15 range.
Ian W is offline