Originally Posted by
Sir Korsky
Thanks ND - also, do you know if hot fluid is the only time an EP permits closing the main 1(2) SOV ?
OPC ? 🙂
EP instructs main SOV closure for high fluid temperature and low fluid quantity (providing other system is serviceable)