Yes, I believe the runway will will be grooved and re-profiled/resurfaced ahead of the start of RYR operations and I assume it will take place during the autumn/winter months. As far as taxiways are concerned I've heard nothing on that score but one thing that could be considered is a holding loop serving the threshold of runway 05 as that would increase the movement capacity of the runway.