Originally Posted by
NorthSouth
Just out of interest, is that 8-sector schedule do-able with a single flight crew? Presume it must be because they must surely be basing a crew at Carlisle.
Two crews per day with an average of 2 days off per week so a 2.5 or 3 crew operation