BA have added more flights to there S18 LGW schedule. A number of the additional flights are shown as operated by a Titan A320.
The schedule now shows that Titan will require 3 A320’s to operate all the flights they are shown as operating. Does anyone know if they are adding another A320 aircraft to the fleet in the coming months?.
Also is there any update on when they are planning to reconfigure the A318?.