Go Back  PPRuNe Forums > Flight Deck Forums > Tech Log
Reload this Page >

Bonded Repairs

Wikiposts
Search
Tech Log The very best in practical technical discussion on the web

Bonded Repairs

Thread Tools
 
Search this Thread
 
Old 12th Nov 2015, 18:53
  #1 (permalink)  
Thread Starter
 
Join Date: Nov 2004
Location: Schierbrok / Germany
Age: 68
Posts: 16
Likes: 0
Received 0 Likes on 0 Posts
Bonded Repairs

Bonded doubler repairs to composites, carbon or glass must be justified considering the failure case, i.e depending on the structure classification must be able to carry limit or ultimate loading without the repair. Does the same hold true for metal to metal repair?
Bazzo is offline  
Old 13th Nov 2015, 01:14
  #2 (permalink)  
 
Join Date: Jan 2002
Location: West Country
Posts: 1,271
Likes: 0
Received 0 Likes on 0 Posts
I dont quite understand the question but any metal to metal repairs as long as they are carried out IAW the SRM meet the original structural integrity.
Jet II is offline  
Old 13th Nov 2015, 18:06
  #3 (permalink)  
Thread Starter
 
Join Date: Nov 2004
Location: Schierbrok / Germany
Age: 68
Posts: 16
Likes: 0
Received 0 Likes on 0 Posts
Cosmetic Repairs

Jet II, basically what I mean is bonded doublers on composite components are considered “cosmetic” or “non structural”. Is this the same for metal to metal bonds?
Bazzo is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.