Wikiposts
Search
Spectators Balcony (Spotters Corner) If you're not a professional pilot but want to discuss issues about the job, this is the best place to loiter. You won't be moved on by 'security' and there'll be plenty of experts to answer any questions.

Test Pilots

Thread Tools
 
Search this Thread
 
Old 6th Jan 2017, 10:35
  #1 (permalink)  
c52
Thread Starter
 
Join Date: Sep 2007
Location: Surrey
Posts: 2,262
Received 0 Likes on 0 Posts
Test Pilots

What does a test pilot do? I don't mean in the year between first flight of a new type and it being deemed airworthy, but say if the 5000th A320 or B737-800 is produced, what is achieved during the pre-delivery flights?

What other roles does a test pilot have?
c52 is offline  
Old 6th Jan 2017, 10:49
  #2 (permalink)  
 
Join Date: Nov 2005
Location: Wildest Surrey
Age: 75
Posts: 10,826
Received 98 Likes on 71 Posts
Why don't you ask that on the 'Flight Testing' thread?
chevvron is offline  
Old 6th Jan 2017, 14:23
  #3 (permalink)  
 
Join Date: Sep 2002
Location: La Belle Province
Posts: 2,179
Likes: 0
Received 0 Likes on 0 Posts
A production test pilot will, on a newly built aircraft, conduct a series of tests during one or more likely several flights to verify that the aircraft has been built according to the design and operates accordingly. While there are many things checks on ground or during build, some things can only be checked out by operating the whole aircraft. Examples of tests they might do are basic trimmability (checks the aircraft was built "straight"), stalls to confirm the stall speeds are appropriate (checks the wing build, mainly) and that any stall warning/protection system work correctly, engine relights, radio checks (looking for interference effects, for example) and whole bunch of stuff.

In terms of "the year between first flight of a new type and it being deemed airworthy" I think you've been listening a bit too much to the hype. A year from first flight to certification is very optimistic, especially for any kind of significantly new design. Personally, I've only seen it once, and that was on a pretty straightforward derivative.

But however long it takes, once you get into "post certification" you are not done with test flying at all. You're going to have all kinds of product improvements to test - new kit, or new capabilities. All generally require a flight test of some scope. You're also going to have in-service issues come up that you didn't anticipate - failure modes that no-one thought of. You might have to do some flight tests to understand the consequences, and work out what you need to do as a fix. And then more tests to actually certify the fix.

That's all just the flying part. A decent part of the TP's job, both during the initial certification and perhaps even more "post cert" is the engineering part of the job as an "engineering test pilot". Reviewing designs and proposals to aid the engineers in coming up with something which is going to "work" in pilot terms. So, lots of meetings and paperwork.

(And no, full disclosure, I'm not a TP, but I do deal with them a lot)
Mad (Flt) Scientist is offline  
Old 6th Jan 2017, 20:44
  #4 (permalink)  
c52
Thread Starter
 
Join Date: Sep 2007
Location: Surrey
Posts: 2,262
Received 0 Likes on 0 Posts
Thank you.
c52 is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.