Go Back  PPRuNe Forums > PPRuNe Worldwide > South Asia and the Far East
Reload this Page >

PNR AND PET explanation & solution

Wikiposts
Search
South Asia and the Far East News and views on the fast growing and changing aviation scene on the planet.

PNR AND PET explanation & solution

Thread Tools
 
Search this Thread
 
Old 24th Nov 2011, 12:29
  #1 (permalink)  
Thread Starter
 
Join Date: Dec 2010
Location: Short final!!!
Posts: 72
Likes: 0
Received 0 Likes on 0 Posts
PNR AND PET explanation & solution

G Day

I am doing self study for DGCA exams, reference material around me - GSP Navigation, Flight Planning, Radio Aids, Oxford ATPL, and Suriender's notes.

I am not able to solve few problems in PNR and PET which I came across in surinder's notes, i just don't understand the steps I tried to look up in other text books I have but couldn't find any explanation or similar problems. I am quite good with basic problems like from point A to B with just one wind vector, am posting the problems here someone please explain how to solve them.

1) Find Dcp, Tcp, Dpnr , Tpnr (assume engine failure at PNR and a/c returns on reduced TAS)
Distance - 1200nm
Track - 090
w/v - 090/20kts for 1st 600nm
w/v - 125/40kts for rest of the distance
TAS - (N)420kts, (R)260kts
FOB - 4300kg
Reserve - 1150kg
Fuel Burn - (N)975kg/hr, (R)550kg/hr.

Last edited by aviator86; 24th Nov 2011 at 12:43.
aviator86 is offline  
Old 24th Nov 2011, 12:34
  #2 (permalink)  
Thread Starter
 
Join Date: Dec 2010
Location: Short final!!!
Posts: 72
Likes: 0
Received 0 Likes on 0 Posts
Another problem

2)
Distance - 990nm
Track - 160
w/v - 360/25kts for 600nm
w/v - 180/10 for renaming distance
TAS - (N)300kts, (R)190kts
FOB - 3500kg
Reserve - 700kg
Fuel Burn - (N)770kg/hr , (R)410kg/hr

Find - Dcp, Tcp, Dpnr, Tpnr
(assume engine failure at PNR and a/c returns with reduced TAS)
aviator86 is offline  
Old 24th Nov 2011, 14:12
  #3 (permalink)  
Thread Starter
 
Join Date: Dec 2010
Location: Short final!!!
Posts: 72
Likes: 0
Received 0 Likes on 0 Posts
3)
Flying from A to C via B. In case of engine failure a/c is to land at B.
-> Find Dcp & Tcp from A. (assume engine fails after B)
-> Find Dpnr & Tpnr.
(assume engine fails at PNR and a/c returns on reduced TAS to B)

FOB - 5200kg
Reserve - 700kg
Fuel Burn - (N)1425kg/hr, (R)820kg/hr
TAS - (N)420kts, (R)255kts
A to B -> Track - 090, w/v - 125/35, Distance - 460
B to C -> Track - 115, w/v - 135/18, Distance - 670
C to B -> Track - 295, w/v - 135/18, Distance - 670
B to A -> Track - 270, w/v - 125/35, Distance - 460
aviator86 is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.