Wikiposts
Search
The Pacific: General Aviation & Questions The place for students, instructors and charter guys in Oz, NZ and the rest of Oceania.

Cost of an engine "Bulk Strip"

Thread Tools
 
Search this Thread
 
Old 12th Aug 2004, 03:22
  #1 (permalink)  
Thread Starter
 
Join Date: Mar 2004
Location: australia
Posts: 136
Likes: 0
Received 0 Likes on 0 Posts
Cost of an engine "Bulk Strip"

This is one for a LAME or experienced mechanic to answer. Can anyone tell me what exactly happens in the "bulk strip" process of engine overhaul or repair. Most aircraft that have suffered seemingly minor engine damage in landings or other incidents are required to undergo a bulk strip. What is that exactly and why does it seem to always cost tens of thousands of dollars? Are all parts replaced regardless of damage?

What's the story with the old bulk strip?

cheers

Gin.
ginjockey is offline  
Old 12th Aug 2004, 07:22
  #2 (permalink)  
 
Join Date: Mar 2000
Location: Still in Paradise
Age: 60
Posts: 861
Likes: 0
Received 0 Likes on 0 Posts
Ain't a LAME but from recent personal experience:

If a bulk strip is required due to age or prop strike (as common examples), all the 'soft' seals and gaskets are required to be replaced - there's about a $K already. The labour to do the job in time alone will usually run to $3-$5 K. Anything found to be outside the manufacturers specifications needs to be replaced in the rebuild - can be MANY $Ks there. Removing and refitting the engine can run $3-$5 K as well.

If the engine is within 500hrs of OH, it is seldom worthwhile bulk stripping; just OH and start the clock again.

Only my opinion; I'm sure there's plenty of 'cheap' bulks been done.
Jamair is offline  
Old 13th Aug 2004, 02:02
  #3 (permalink)  
 
Join Date: Mar 2004
Location: north of the pole
Posts: 79
Likes: 0
Received 0 Likes on 0 Posts
bulk strip

TCM engine are mandated to require a bulk strip for a propstrike. The have a SB for propstrikes on their web site.

Their definition is anything that requires the prop to be removed for repair (even if the engine was not running at the time), or a sudden stopage of the engine requires the 'bulk strip' of the engine.

Costs, approx 1 to 2K for engine removal and installation for a simple engine, double for complex.

3 to 5K for engine teardown and cleaning, and rebuild.

1k for inspection and checking

1.5K for bearings and replacement parts

The last one I was involved in was 8.5K without the cost of the prop.
piontyendforward is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.