Blackjack back into production..
Thread Starter
Join Date: Aug 2007
Location: London, New York, Paris, Moscow.
Posts: 3,632
Likes: 0
Received 0 Likes
on
0 Posts
Blackjack back into production..
The Soviets [ in all but name] to restart production of strategic bomber...In a series of tweets on 29 April, the ministry says it is “necessary to resume production of the Tu-160 missile carriers”,..
Russia to reestablish Tu-160 supersonic bomber production line - 4/30/2015 - Flight Global
Russia to reestablish Tu-160 supersonic bomber production line - 4/30/2015 - Flight Global
Dysonsphere Guess they kept the jigs unlike our muppets who order them destroyed asap
Join Date: Aug 2014
Location: New Braunfels, TX
Age: 70
Posts: 1,954
Likes: 0
Received 0 Likes
on
0 Posts
It's a lot harder to restart a cold production line than most people realize. Russia and Ukraine have been trying for decades to restart the An-124 production line with no success. Yes, the jigs are still available to assemble the airplane, but the industrial base to produce the necessary parts is long gone. I suspect restarting the Tu-160 line will be at least as difficult as restarting the An-124 line, and likely more so.
Join Date: Oct 2011
Location: Penzance, Cornwall UK
Age: 84
Posts: 30
Likes: 0
Received 0 Likes
on
0 Posts
Information or disinformation? Dunno. It could be one way for a canny president Putin to cause alarm in the West without actually spending a rouble IF it is just an elaborate spoof.
Hopefully the West isn't totally asleep and we'll see some changes in defence spending.
Wonder if they know something we don't?
Always remember the politicians and VSOs in the Ivory Towers saying that we would have 10 years warning of an new Russian threat, I think it was a key assumption in SDSR 10; one wonders when the 10-year clock started ticking? 2010? 2009? 2005?
Join Date: Jan 2011
Location: In an ever changing place
Posts: 1,039
Likes: 0
Received 0 Likes
on
0 Posts
Not my filming, but here is one flying over Moscow today.
https://www.youtube.com/watch?v=kZ5CSRUUZeY
https://www.youtube.com/watch?v=kZ5CSRUUZeY
This one sets the improbability meter off. Maybe there are some hangar queens to be brought to upgraded/operational status, but otherwise not a lot of strategic sense to this.
Ecce Homo! Loquitur...
They're upgrading the 12 they have with with new a new cockpit, and looking at at engine upgrade. If they have have some extra partial airframes it might make it economic to produce a couple of attrition spares to make the fleet viable.
In the mean time, the major effort will be in the PAK-DA progarmme regardless of the hype..
In the mean time, the major effort will be in the PAK-DA progarmme regardless of the hype..
Join Date: Oct 2006
Location: The Great Midwest
Posts: 245
Likes: 0
Received 0 Likes
on
0 Posts
First flight of the Tu-160 was in 1981, with the type entering Russian Air Force service in 1987. Thirty-six aircraft were built. Moscow is slowly upgrading the current fleet, with money allocated for three of the remaining 16 Blackjacks. The improvements were to include comm/nav gear and better engines.
Tu-160s are based at Engels Airbase near Saratov in the heart of the former Soviet Union, relatively close to the Russian border with Kazakhstan. The Blackjacks fly with a crew of four.
The Russians have been working on Tu-160 upgrades for a long time (10 years). What they have finally been able to deliver is a partial upgrade to the avionics, but not the engine upgrade which was one of the key upgrades. My guess is that restarting the production line will take much longer.
Tu-160 returns from overhaul - Blog - Russian strategic nuclear forces
Further delays for modernisation of Russian Air Force Tu-160 bombers - IHS Jane's 360
Tu-160s are based at Engels Airbase near Saratov in the heart of the former Soviet Union, relatively close to the Russian border with Kazakhstan. The Blackjacks fly with a crew of four.
The Russians have been working on Tu-160 upgrades for a long time (10 years). What they have finally been able to deliver is a partial upgrade to the avionics, but not the engine upgrade which was one of the key upgrades. My guess is that restarting the production line will take much longer.
[July 5, 2006]
At last, the Air Forces received the Tu-160 bomber that was undergoing overhaul at the Kazan Aviation Plant (this plane was expected to be back in 2005, but this was delayed several times ). The aircraft was christened "Valentin Bliznyuk", after the Chief Designer of the plane.
As it was reported earlier, the overhaul did not seem to include upgrade of avionics. However, the aircraft was reportedly given the capability to use conventional weapons.
At last, the Air Forces received the Tu-160 bomber that was undergoing overhaul at the Kazan Aviation Plant (this plane was expected to be back in 2005, but this was delayed several times ). The aircraft was christened "Valentin Bliznyuk", after the Chief Designer of the plane.
As it was reported earlier, the overhaul did not seem to include upgrade of avionics. However, the aircraft was reportedly given the capability to use conventional weapons.
[December 9 2014]
Further delays for modernisation of Russian Air Force Tu-160 bombers
The modernisation of 16 Tupolev Tu-160 'Blackjack' strategic bombers, which according to the long range plans of the Russian Air Force (VVS) should have been completed in 2017, may be delayed to 2019 or beyond, IHS Jane's has been told by some of the specialists assigned to the project.
At present there is still no finalised configuration as to what Soviet-era components will be replaced on these aircraft. Additionally, the manufacturer of the aircraft's Kuznetsov NK-32 engines is unable to come to an agreement with the United Aero-Engine Building Corporation (ODK) on the question of financing.
A source close to ODK has relayed to IHS Jane's that the current work on the modernisation of the Tu-160 and the re-opening of the production line that would manufacture the necessary components for these aircraft is "at a phase when it is difficult to project a timeframe in which this process would be completed".
The delays and problems plaguing this programme are not new. Just prior to the Moscow MAKS air show in August 2011, Russian news outlets stated that of the 16 Tu-160s still in VVS inventory only four were flightworthy. The main limiting factor is that most of the NK-32 engines had at that point reached the end of their service life. The Kuznetsov Design Bureau (OKB) that developed the engine and the KMPO production plant that built them during the Soviet period have not produced any new engines in more than a decade. The enterprises no longer have either adequate personnel or the machine-tooling to be able to manufacture them.
Further delays for modernisation of Russian Air Force Tu-160 bombers
The modernisation of 16 Tupolev Tu-160 'Blackjack' strategic bombers, which according to the long range plans of the Russian Air Force (VVS) should have been completed in 2017, may be delayed to 2019 or beyond, IHS Jane's has been told by some of the specialists assigned to the project.
At present there is still no finalised configuration as to what Soviet-era components will be replaced on these aircraft. Additionally, the manufacturer of the aircraft's Kuznetsov NK-32 engines is unable to come to an agreement with the United Aero-Engine Building Corporation (ODK) on the question of financing.
A source close to ODK has relayed to IHS Jane's that the current work on the modernisation of the Tu-160 and the re-opening of the production line that would manufacture the necessary components for these aircraft is "at a phase when it is difficult to project a timeframe in which this process would be completed".
The delays and problems plaguing this programme are not new. Just prior to the Moscow MAKS air show in August 2011, Russian news outlets stated that of the 16 Tu-160s still in VVS inventory only four were flightworthy. The main limiting factor is that most of the NK-32 engines had at that point reached the end of their service life. The Kuznetsov Design Bureau (OKB) that developed the engine and the KMPO production plant that built them during the Soviet period have not produced any new engines in more than a decade. The enterprises no longer have either adequate personnel or the machine-tooling to be able to manufacture them.
Join Date: Mar 2009
Location: Perth Western Australia
Age: 57
Posts: 808
Likes: 0
Received 0 Likes
on
0 Posts
Always remember the politicians and VSOs in the Ivory Towers saying that we would have 10 years warning of an new Russian threat, I think it was a key assumption in SDSR 10; one wonders when the 10-year clock started ticking? 2010? 2009? 2005?
Its a fine line judging what may just be innocent upgrading and modernization of decrepit military forces, and a build up in a prelude to world domination.
There are significant resources in various military who try to make that judgment. Now going from history, I'm not sure we have a good track record in such things. Recent events, appear to indicate that some time in the future we might be in a little bit of dodo if we don't pull our heads out of our butts.