Jeddah Airport Expansion - renders
Hi there,
I got some renders of the new terminal complex that's going to replace the current crap we have at the moment. I thought I might share them with you:
What do you think? This is the masterplan. Phase 1 (supposed to finish in 2011 ) is the bottom x shaped building only, the two satellites are for future expansion.
I got some renders of the new terminal complex that's going to replace the current crap we have at the moment. I thought I might share them with you:
What do you think? This is the masterplan. Phase 1 (supposed to finish in 2011 ) is the bottom x shaped building only, the two satellites are for future expansion.
Join Date: Mar 2000
Location: Arizona USA
Posts: 8,571
Likes: 0
Received 0 Likes
on
0 Posts
Considering the original NEW Jeddah airport opened a whole seven years late, and 34L had to be re-built three times....one wonders if this fiasco will ever get off the ground?
Thread Starter
Join Date: Jan 2006
Location: UK
Posts: 97
Likes: 0
Received 0 Likes
on
0 Posts
I'm pretty sure something will be done, what how where and when I don't know, but JED airport cannot go on in it's current state for long. I think it helps that it's a DBOT, since the private sector should do things better. But I think 2011 is unrealistic, since it hasn't been put to tender yet, and I doubt the winning bidder will be chosen before 2008.
Thread Starter
Join Date: Jan 2006
Location: UK
Posts: 97
Likes: 0
Received 0 Likes
on
0 Posts
A video presentation on the expansion programme:
http://www.youtube.com/watch?v=vAUczzaZTUY
Very grand.
http://www.youtube.com/watch?v=vAUczzaZTUY
Very grand.
Thread Starter
Join Date: Jan 2006
Location: UK
Posts: 97
Likes: 0
Received 0 Likes
on
0 Posts
Hi Mutt,
Happy to hear the contractors are there. Relief is in sight!
Regarding Riyadh airport, do they need any expansion work? They have a whole terminal unused. If things get tight they can always open the fourth terminal.
Happy to hear the contractors are there. Relief is in sight!
Regarding Riyadh airport, do they need any expansion work? They have a whole terminal unused. If things get tight they can always open the fourth terminal.
Join Date: Sep 1999
Location: ME
Posts: 5,502
Likes: 0
Received 0 Likes
on
0 Posts
It has gone beyond tight..... 10-30 minute arrival delays due to gate congestion are common, its worth remembering that NAS and SAMA have few aircraft so this problem will only get worse.
Its time for terminal 4 to be opened
Mutt
Its time for terminal 4 to be opened
Mutt