7th Dec 2009, 08:41
Hello all. - Need some additional brain power if someone could oblige I would be grateful
I am working on a spreadsheet that calculates how much to charge when an engineer has to work away from base. The engineers themself's get paid overtime when they work outside the hours of 08:00 to 16:30.
I would like the line on the sheet to look like
Depart time ....... Arrival time ........ Total cost...........
If the engineer departs at say 08:00 and the arrival time was 17:30 I would have 8.5 hours at 'Normal' time and 1 hours at overtime, which is at time and half
So the answer to the sum would be 8 * £60 (say) and 1 * £90 = £570
But how do I write the formula so that it 'knows' that any hours outside the boundries of 08:00 thru 16:30 are to be charged at 1.5 times the normal rate?
Thanks in advance
The Doc
I am working on a spreadsheet that calculates how much to charge when an engineer has to work away from base. The engineers themself's get paid overtime when they work outside the hours of 08:00 to 16:30.
I would like the line on the sheet to look like
Depart time ....... Arrival time ........ Total cost...........
If the engineer departs at say 08:00 and the arrival time was 17:30 I would have 8.5 hours at 'Normal' time and 1 hours at overtime, which is at time and half
So the answer to the sum would be 8 * £60 (say) and 1 * £90 = £570
But how do I write the formula so that it 'knows' that any hours outside the boundries of 08:00 thru 16:30 are to be charged at 1.5 times the normal rate?
Thanks in advance
The Doc