PPRuNe Forums - View Single Post - Missed Approach - when to climb?
View Single Post
Old 20th Sep 2017, 06:46
  #99 (permalink)  
oggers
 
Join Date: Nov 2005
Location: Zulu Time Zone
Posts: 730
Likes: 0
Received 0 Likes on 0 Posts
PANSOPS Vol I

6.1.4 It is expected that the pilot will fly the missed approach procedure as published. If a missed approach is initiated before arriving at the missed approach point (MAPt), the pilot will normally proceed to the MAPt (or to the middle marker fix or specified DME distance for precision approach procedures) and then follow the missed approach procedure in order to remain within the protected airspace.
Note 1.— This does not preclude flying over the MAPt at an altitude/height greater than that required by the procedure.
The end.
oggers is offline