In following the requirements of the ASB the main focus is on the jam nut that secures the rod end, inspection is to make sure is tight and if found loose. The push rod assembly is removed and replaced with a new part that is assembled correctly.
The ASB also requires the jam nuts to be marked so that on future inspection can see if the nut has slipped ( moved ) .