PPRuNe Forums - View Single Post - Do-17 salvage starts today
View Single Post
Old 7th May 2013, 07:43
  #17 (permalink)  
sisemen
 
Join Date: Mar 2008
Location: Why oh why would I wanna be anywhere else?
Posts: 1,305
Likes: 0
Received 1 Like on 1 Post
Like I say
"Us? Rearming? Perish the thought".
Dornier Do 17 - Wikipedia, the free encyclopedia

In 1932, the Ordnance Department (Heereswaffenamt) issued a specification for the construction of a "freight aircraft for German State Railways", and a "high speed mail plane for Lufthansa".[1] The factory at Friedrichshafen began work on the design on 1 August 1932.[1]

When the Nazis took power in 1933, Hermann Göring became National Commissar for aviation with former Deutsche Luft Hansa employee Erhard Milch as his deputy, soon forming the Ministry of Aviation. The Ministry of Aviation designated the new aircraft Do 17, and on 17 March 1933, just three months after taking office, Milch gave the go-ahead for the building of prototypes. At the end of 1933, the Ministry of Aviation issued an order for a "high speed aircraft with double tail," and for a "freight aircraft with special equipment," in other words, a bomber. The original design (the Do 17 V1) configuration in 1932 had sported a single vertical stabilizer, and Dornier continued developing that model. The Do 17 was first demonstrated in mock-up form in April 1933. The "special equipment" was to be fitted later, to disguise its offensive role.[4]

........the Do 17 V1 was contracted as a fast six-passenger mail plane
sisemen is offline