PPRuNe Forums - View Single Post - When are you required to maintain a plotting chart?
Old 27th Dec 2012, 21:11
  #45 (permalink)  
g450cpt
 
Join Date: Oct 2012
Location: Worldwide
Posts: 74
Likes: 0
Received 0 Likes on 0 Posts
flyburg

That is how it is written in our ops manual that is approved by our POI. International initial and yearly recurrents also state the same thing. Would you really want driftdown perpendicular to the NATs if your route had you overflying the NATs? If you are flying for a 121 carrier then you may never do a random route over the NATs. You will probably be on a track for every crossing or if on a random route well away from the tracks since your aircraft will be too heavy for a climb to FL430. What does your manual say? Is there anything about the driftdown contingency if you above the NATs on a random route? I am curious as to what your company manual wants you to do in that scenario.

Last edited by g450cpt; 27th Dec 2012 at 21:12.
g450cpt is offline