PPRuNe Forums - View Single Post - North Sea heli ditching: Oct 2012
View Single Post
Old 31st October 2012 | 13:32
  #235 (permalink)  
JohnDixson
15 Anniversary
 
Joined: Mar 2007
Posts: 1,017
Likes: 165
From: Hobe Sound, Florida
Eurocopter Power Train Design Staff

Given:
  1. The two different failure modes of the main box.
  2. Absence of a published retrofit design corrective action for the first ( I could have missed it ).
  3. That after the first lower shaft failure, an incorrect technical assessment was made.
My guess is that there are some design guys/girls at Eurocopter that would love to only be worrying about things like oil filter attachment bolt material and pattern*. Excedrin Headache No 89 would be if they have to redesign and requalify a new shaft.



*Should have added the transmission foot cracks, too. ( That one should have been a major embarrassment to anyone at SA who remembers the S-61 station 290 transmission support cracking 10 year saga ).


Thanks,
John
JohnDixson is offline  
Reply